top of page
  • Linkedin
  • Instagram
Search

My Blueprint progress

Writer's picture: Evan KileyEvan Kiley

I am beginning my Original work, and one of the biggest portion of that is the blueprint of my project, which is the house that will model a LEED certified home. I completed this by doing the following:

1. I started with a tool called “room wizard”, with this tool, I was able to make an original 2D room that I was going to then later expand on. I started with an off-cube shape that had two missing corners. I also then chose the feel of the inside, I chose contemporary to create a homey but simplistic look to make it easy to work with for designers

2. I then designed a bathroom, a bedroom, a kitchen, and a garage with all the necessary appliances. I had to begin thinking about how to make the building more environmentally friendly as I designed it.

3. At this point, I began to complete the original design and was now focusing on installing environmentally friendly devices. This was when I needed to begin researching what previous platinum-rated LEED buildings required to make mine certified as well.

4. I began installing the many devices I would need to make it LEED certified, such as solar panels and water recyclers.

0 views0 comments

Recent Posts

See All

The Final Blog

This blog is the second to last product I will be creating for this class and it is also an indirect goodbye to Mr. Green and the ISM...

The completion of the preparation:

At this point in my ISM career, I feel like I have completed all of the small parts that I have needed to finally reach the point where I...

Realizing my mistake: 

I made a mistake when originally devising my plan for the Solar Shield. I believed that I would be able to create a working Raspberry Pi...

Opmerkingen


IMG-4503.jpg

Contact

Connect with Me

LinkedIn - linkedin.com/in/evankiley

Location - Frisco, Texas

  • Instagram
  • Linkedin

© 2021 by Evan Kiley. Powered by Wix

bottom of page